A successful trial on our first core insulation gas pressure casting furnace.
This is Dralon’s first core insulation gas pressure casting furnace client, the furnace has been used over six months, both taphole and iron entrance are in good condition, the inductor can be seen from different data that the ditch became smaller, all date became normal after Dralon’s technical staff cleaned the ditch. It can be used about one year. This client has used many foreign brands, the taphole, iron entrance and the inductor needed to be changed every six months.
|